Mapping it out
The proposed 65-mile steel pipeline would interconnect with existing Rockies Express Pipeline in Scott County, Illinois. From there, the pipeline will travel through Greene and Jersey Counties in Illinois and St. Charles and St. Louis Counties in Missouri before connecting with existing Laclede Gas facilities. From there, the pipeline will travel through the north portion of St. Louis County for six miles before terminating at the Enable Mississippi River Transmission Line.
Before work begins, we will conduct civil, environmental and cultural resource surveys along the proposed path to identify the best possible route with the greatest protection to sensitive areas.